3/F Talent Building, Shiqiao Subdistrict, Xiacheng District, Hangzhou China
Home ProductsSteel Box Girder Bridge

Single Lane Steel Box Girder Bridge , Suspension Steel Truss Pedestrian Bridge Multi Span

Certification
Good quality Military Bailey Bridge for sales
Good quality Military Bailey Bridge for sales
good team members always offer budget in time and answer questions with patience, great job!

—— Donald Mcwayne

I am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.

—— Joseph Alexander

I'm Online Chat Now

Single Lane Steel Box Girder Bridge , Suspension Steel Truss Pedestrian Bridge Multi Span

China Single Lane Steel Box Girder Bridge ,  Suspension Steel Truss Pedestrian Bridge Multi Span supplier
Single Lane Steel Box Girder Bridge ,  Suspension Steel Truss Pedestrian Bridge Multi Span supplier Single Lane Steel Box Girder Bridge ,  Suspension Steel Truss Pedestrian Bridge Multi Span supplier Single Lane Steel Box Girder Bridge ,  Suspension Steel Truss Pedestrian Bridge Multi Span supplier Single Lane Steel Box Girder Bridge ,  Suspension Steel Truss Pedestrian Bridge Multi Span supplier

Large Image :  Single Lane Steel Box Girder Bridge , Suspension Steel Truss Pedestrian Bridge Multi Span

Product Details:

Place of Origin: China
Brand Name: JZQL
Certification: ISO9001
Model Number: JBEC200

Payment & Shipping Terms:

Minimum Order Quantity: 1
Price: USD1000~USD1200 per ton
Packaging Details: seaworthy packings for container shipping
Delivery Time: 30 days
Payment Terms: L/C, T/T, D/A, D/P, Western Union
Supply Ability: 10000 units per year
Contact Now
Detailed Product Description
NAME: Concrete Girder Bridge Grade: Q345B-Q460C
Dimensions: Standard Feature: Single Lane
Brand Name: FAMOUS Model Number: CB100(321-Type)&HD200
Type: Modular Deck -type Assembly Steel Bridges Application: Temporary Or Permanent Steel Structure Bridge
Color: Gray

Multi-span Single Lane Steel Box Girder Bridge Structural Formwork Truss Construction

Description

Steel Box Girder Bridge refers to a beam bridge whose main beam is in the form of a thin-wall closed section. Long hollow trusses made of steel or concrete are usually used as beams. This makes the bridge light and sturdy. Bridges constructed using this method are called Steel Box Girder Bridge.

 

Specification

Product Name Steel box girder bridge
Width 4.2meter
Maximum span 64meter single span
Bridge deck Steel composit panel
Steel grade Q345B
Loading capacity 20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20
Corrosion Hot dip galvanized
Advantages Price effective and technical full analysis and supports

 

Steel box girder bridges are commonly used for highway flyovers and for modern elevated structures of light rail transport. Although normally the steel box girder bridge is a form of beam bridge, box girders may also be used on cable-stayed bridges and other forms.

 

Parts of the bridge
The basic Bailey bridge is made up of three main parts, the floor, the stringers and the side panels. The floor of the bridge is made up of a number of 19-foot-wide transoms (5.8 m) that run across the bridge. Across the bottom of these, forming a square, are 10-foot-long stringers (3.0 m). The bridge's strength is provided by the panels on the sides. The panels are 10-foot-long (3.0 m), 5-foot-high (1.5 m), cross-braced rectangles. Each weighs 570 pounds (260 kg), and can be lifted by six men.

 

Application

Generally used for urban bridges or highway viaducts and overpasses with small spans
Reinforced concrete: medium and small span
Prestressed reinforced concrete: large span
Straight leg frame (door type) and slant leg frame: medium and small span
T-shaped rigid frame, continuous rigid frame: large span

· Road Bridges

· Pedestrian Bridges

· Railway Bridges

· Steel Truss Bridge

· Beam Bridges

· Steel Bailey bridge

· Structural Steel Box Bridge

· Highway Bridges

· Composite Beam Bridge

· Cable-Stayed Bridge

· Floating Bridge etc.

 

Construction
For steel box girders, the girders are normally fabricated off site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast in-place using temporary falsework supported by the steel girder.

Either form of bridge may also be installed using the technique of incremental launching. Under this method, gantry cranes are often used to place new segments onto the completed portions of the bridge until the bridge superstructure is completed.

 

Features
Modular, pre-engineered, pre-fabricated bridge system
Standard interchangeable components
Highly adaptable, fully reusable and re-locatable
Transported in standard ISO containers
Quick and simple to build using labour
Fully galvanized for long life and minimum maintenance
3.048m module length
4.2m single lane
Proprietary steel decking systems to suit different loading requirements
Durbar finish or factory applied anti-skid surfacing
Full highway load carrying capability
Simple, cost effective foundations

 

Our company

Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.

 

Single Lane Steel Box Girder Bridge ,  Suspension Steel Truss Pedestrian Bridge Multi Span

 

Finally

The success of the Bailey bridge was due to the simplicity of the fabrication and assembly of its modular components, combined with the ability to erect and deploy sections with a minimum of assistance from heavy equipment. Many previous designs for military bridges required cranes to lift the pre-assembled bridge and lower it into place. The Bailey parts were made of standard steel alloys, and were simple enough that parts made at a number of different factories could be completely interchangeable. Each individual part could be carried by a small number of men, enabling army engineers to move more easily and more quickly than before, in preparing the way for troops and materiel advancing behind them. Finally, the modular design allowed engineers to build each bridge to be as long and as strong as needed, doubling or tripling up on the supportive side panels, or on the roadbed sections.

 

Contact Details
Jiangsu Jiuzhou Bridge Engineering Co., Ltd.

Contact Person: Mr. Tomy.Gao

Tel: 86-571-87688170

Fax: 86-571-56389287

Send your inquiry directly to us (0 / 3000)