3/F Talent Building, Shiqiao Subdistrict, Xiacheng District, Hangzhou China | Honesty.tomi@hotmail.com |
Product Details:
Payment & Shipping Terms:
|
Material: | Q345B Steel | Surface Treatment: | Painted Or Hot Dip.etc |
---|---|---|---|
Size: | According To Client's Need | Installation: | Lifted Into Place By Hand Without Crane, Easier Construction.etc |
Multi-use: | Civil Engineering Construction Projects And To Provide Temporary Crossings For Foot & Vehicle Traffic. | Carry Capacity: | Resist Strong Wind And Earthquake, Bears Heavy Snow.etc |
Type: | 200-type | ||
High Light: | temporary modular bridge,prefab pedestrian bridge |
Description
Most Bailey bridges are assembled and installed in a matter of days by a small crew. Common hand tools are utilized. All connections are pinned, bolted or clamped. No welding is necessary. Dis-assembly is similarly easy, and components can be stored in minimal space until reused. Bailey bridges are often installed by the cantilever launching method, in which the assembled bridge together with a “launching nose” is rolled out across the gap, without false-work or heavy equipment. The cantilever method allows bridges to be quickly erected over rivers or deep gorges. Additionally, some Bailey bridges may be hoisted into place by crane.
Specification
Product Name | Modular steel bridge |
Width | 7.6m |
Maximum span | 64meter single span and 200meter multi span |
Bridge deck | Steel composit panel |
Steel grade | Q345B (equivalent to ASTM A572) |
Loading capacity | 20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20 |
Corrosion | Original painted or Hot dip galvanized |
Advantages | Price effective and technical full analysis and supports |
Three normal width bridges are as following:
3.15m width (model CB100/321): light weight and load, mostly used over middle or small span rivers.
4.2m (model HD200) width: marked both in metric and inch dimension, mostly used in International market over middle and large span rivers.
7.35m width (model HD200): two-lane bridge, widely used over various rivers.
Application
Three normal width bridges are as following:
3.15m width (model CB100/321): light weight and load, mostly used over middle or small span rivers.
4.2m (model HD200) width: marked both in metric and inch dimension, mostly used in International market over middle and large span rivers.
7.35m width (model HD200): two-lane bridge, widely used over various rivers.
Type
Beam Bridge
Boardwalk
Clapper bridge
Duckboards, Timber track way, Plank road, and Corduroy road
Moon bridge
Simple suspension bridge
Simple truss
Stepping stones
Zigzag bridge
Features and Benefits
1.Environmental protection
2.Higher reliability of steel work
3.Strong quake proof
4.Higher degree of industrialization
5.Quick to be assembled accurately
6.Larger interior space
Advantage
1.High strength and big stiffness, relative to the concrete bridge can be reduced trabecular high and self-respect
2. Due to the steel isotropic, quality of a material is uniform and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption
3. Steel bridge generally USES factory, site splicing, the construction period is short, processing convenient and not affected by seasonal effect.
4. Steel bridge is suitable for industrialized manufacture and very convenient to transport.
5. Steel bridge is easy to repair and replace,which has long lifetime. Material can be recycled components, with light weight and low cost.
Installation
Most Bailey bridges are assembled and installed in a matter of days by a small crew. Common hand tools are utilized. All connections are pinned, bolted or clamped. No welding is necessary. Dis-assembly is similarly easy, and components can be stored in minimal space until reused. Bailey bridges are often installed by the cantilever launching method, in which the assembled bridge together with a “launching nose” is rolled out across the gap, without false-work or heavy equipment. The cantilever method allows bridges to be quickly erected over rivers or deep gorges. Additionally, some Bailey bridges may be hoisted into place by crane.
Our company
Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.
Proper project coordination and efficient delivery of the structural steel to your bridge project is a key factor in its ultimate success. This is what gives us the leading edge.
From material purchase and tracing, planning compilation, drawing detailing, production arrangement, quality inspection, to on-going painting, packing and delivering, we have separated department to strictly control process, quality and traceability, so that the perfect Bailey/Belay/Baley Bridge can be made.
Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence.
Warmly welcome all friends and clients from International market to visit us!
Long Span Steel Bailey Bridge , 3m Metal Modular Steel Bridge Structure Engineering
Structural Steel Bailey Bridge , Road Highway Construction Army Bailey Bridge Military
Modular Steel Bailey Bridge Panel Shoring Prefabricated Temporary Rental Q345B Steel
Q345 Bailey Bridge Panel , Bailey Bridge Parts Support On Viaduct Overpass Expressway Construction
Manganese Bailey Bridge Panel High Strength Widely Application In Engineering Projects Rental
Hot Galvanized Steel Truss Bridge Girder Supporting Structure Flyover Footbridge Overcrossing
Sea Span Structural Steel Bridge , Steel Beam Bridge Metal Truss Construction