3/F Talent Building, Shiqiao Subdistrict, Xiacheng District, Hangzhou China | Honesty.tomi@hotmail.com |
Product Details:
Payment & Shipping Terms:
|
NAME:: | Steel Box Girder Bridge | Grade:: | Q345B, Q460C |
---|---|---|---|
Dimensions:: | Customized | Feature:: | Prefabricated |
Type:: | Steel Girder Bridges | Application:: | Permanent Railway Bridges, Footbridges, Highway Flyovers |
Color:: | RAL Colors | ||
High Light: | Prefabricated Heavy Steel Structure Box Modular,Concrete Composite Steel Girder Bridge,Modular Heavy Steel Box Girder Bridge |
Description
A steel box girder bridge is a bridge in which the main beams comprise girders in the shape of a hollow box. The box girder normally comprises either prestressed concrete, structural steel, or a composite of steel and reinforced concrete. The box is typically rectangular or trapezoidal in cross-section. Steel box girder bridges are commonly used for highway flyovers and for modern elevated structures of light rail transport. Although normally the steel box girder bridge is a form of beam bridge, box girders may also be used on cable-stayed bridges and other forms.
Specification
Product Name | Specification of Compact 200 Bailey bridge |
Width | 7.3meter |
Maximum span | 64meter single span |
Bridge deck | Steel composit panel |
Steel grade | Q345B |
Loading capacity | 20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20 |
Corrosion | painted |
Advantages | Price effective and technical full analysis and supports |
It is a simple through-type bridge, that is to say a bridge with a roadway carried between two main load carrying lattice girders (trusses). The lattice girders are built-up from a number of identical panels connected end to end by pins to form a continuous stiff girder from bank to bank. Road bearers, called transoms are laid across the bottom chords of the truss panels, connecting and spacing the main girders apart and at the same time carrying stringers (secondary members) to support timber decking.
Application
Spans from 3.6m to 31m and more - for highways, railways, pathways, bicycle racks, landscaping, etc
Standardized designs - as per Indian BIS a. RC standards and codes
Heavy live loads with high overfills - capable of supporting heavy freighter aircraft and mining haulers
Smooth approaches - from earth embankments due to soil overfill, does not require any approach slab
Low life cycle costs - traffic runs on overfill and not over an exposed bridge deck
Aesthetic structures - the true arch form is accentuated.
Features
Modular, pre-engineered, pre-fabricated bridge system
Standard interchangeable components
Highly adaptable, fully reusable and re-locatable
Transported in standard ISO containers
Quick and simple to build using labour
Fully galvanized for long life and minimum maintenance
3.048m module length
4.2m single lane
Proprietary steel decking systems to suit different loading requirements
Durbar finish or factory applied anti-skid surfacing
Full highway load carrying capability
Simple, cost effective foundations
Advantage
Reduces the slab thickness and self-weight of bridge
Cost effective
Greater strength per unit area of concrete
Quality assurance, as precast girders are made off-site
Construction
For steel box girders, the girders are normally fabricated off site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast in-place using temporary falsework supported by the steel girder.
Either form of bridge may also be installed using the technique of incremental launching. Under this method, gantry cranes are often used to place new segments onto the completed portions of the bridge until the bridge superstructure is completed.
Our company
Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.
Proper project coordination and efficient delivery of the structural steel to your bridge project is a key factor in its ultimate success. This is what gives us the leading edge.
From material purchase and tracing, planning compilation, drawing detailing, production arrangement, quality inspection, to on-going painting, packing and delivering, we have separated department to strictly control process, quality and traceability, so that the perfect Bailey/Belay/Baley Bridge can be made.
Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence.
Warmly welcome all friends and clients from International market to visit us!
Long Span Steel Bailey Bridge , 3m Metal Modular Steel Bridge Structure Engineering
Structural Steel Bailey Bridge , Road Highway Construction Army Bailey Bridge Military
Modular Steel Bailey Bridge Panel Shoring Prefabricated Temporary Rental Q345B Steel
Q345 Bailey Bridge Panel , Bailey Bridge Parts Support On Viaduct Overpass Expressway Construction
Manganese Bailey Bridge Panel High Strength Widely Application In Engineering Projects Rental
Hot Galvanized Steel Truss Bridge Girder Supporting Structure Flyover Footbridge Overcrossing
Sea Span Structural Steel Bridge , Steel Beam Bridge Metal Truss Construction